HAT-SAN Shipbuilding and Repair Industry and Trade Inc. announced on 21.04.2026 the signing of a new business deal. The announcement was made through a public disclosure statement. The company disclosed that it entered into an agreement with a local firm. The agreement encompasses the installation of a 2.113,440 kWp Solar Power Plant (GES). The power plant is scheduled to be built at HAT-SAN’s shipyard in Yalova/Altınova.
Key Details of the Agreement
The total value of the agreement, excluding VAT, amounts to 697.435.20 dollars. Payments will be made in accordance with the terms of the contract, in installments. The company anticipates that this investment will contribute positively to the medium and long-term financial performance.
Background
This article was produced with the assistance of artificial intelligence, revised, and reviewed by an editor. For more information, please refer to the Terms

